PROJECT PROFILE

Installation of Double Catch Basins at Loading Dock

Commercial Property Loading Bay Drainage Rehabilitation
SCOPE OF WORK
The site has drainage issues at the loading dock area. The water ponds in front of the loading door. New double Catch Basin at the loading dock was installed connected with another Catch Basin to allow the storm water flow. The loading dock was designed for 200 mm concrete pad using CSA 32MPa (C-2) concrete including M15 rebar@250mm c/c both direction
SERVICES PROVIDED
- Design, Specification/Tender, Contract Administration, Quality Observations

Loading Area

Installation of Double Catch Basins at Loading Dock

New Concrete Pad and Asphalt Pavement in progress


New Concrete Pad and Asphalt Pavement